Airport Fueling Facility

This project involves the installation of a new Jet A above ground fuel facility and the purchase of two Jet A fuel delivery trucks. more...

Big Rock Boat Ramp

Work under this project includes upgrades to the Big Rock Boat Ramp which is currently a free public use facility for recreational boaters in Campbell River. more...

Campbell River Water Supply

Work under this project involves the relocation of the City's water supply.  more...

Hwy 19A Upgrade - Phase 3

Work under this project continues the upgrades both below and above ground that have taken place from Ken Forde boat launch to Forberg Road. more...

Larwood/Erickson Sewer Upgrade

Work under this project includes the renewal and upgrade of sanitary sewer mains on Erickson, Harrogate and Larwood Roads. more...

Lift Station Generators

Work under this project includes a select number of existing lift stations to be serviced with an appropriately sized stand-by generator at each site. Each site does not currently have a backup power source to service the affected sanitary sewer pumping and control systems during power outages. Through this upgrade to backup generators, the selected lift stations will be able to  maintain continuous sewage flows during a power outage.  more...

Maritime Heritage Centre Sewer Chamber Replacement

Work under this project is intended to address ongoing odour control issues at the Maritime Heritage Centre and consists of replacing the current sewer collection chamber which has reached end of service life. more...

Municipal Broadband Network

Work under phase one of the project will include the installation of micro-duct conduit to service strategic locations in the downtown core with broadband fibre. more...

NWEC Upgrade Project - Phase 2

Work under this project is the second phase of improvements to the City’s existing sewage treatment facility, Norm Wood Environmental Centre, to increase capacity, provide required system redundancy, and to address existing operational concerns. This project includes upgrades to the headworks (sewage screening system) and sani-dump receiving facilities, aeration oxidation ditch piping and electrical system upgrades. more...

Robert Ostler Park Restoration 

This original design is under review as the anticipated effects of climate change and sea level rise are triggering a review of some shoreline projects. Repair of the damaged shoreline large boulders (rip rap) is anticipated. more...

Robron Park Fieldhouse Civil Works

Work under this project consists of the installation of approximately 330 lineal metres of sanitary sewer piping to the existing system in preparation for the construction of the future fieldhouse. more...

Waterfront Sewer Forcemain Upgrade

This project includes the renewal of approximately 4.6 km of the City’s sanitary sewage conveyance system along Hwy 19A from Rockland Road to the Maritime Heritage Centre. more...

Watermain Replacement Projects

Work under this project consists of installing new watermains and domestic services at several locations within Campbell River. more...

 

What's New
Jul 25, 2017 Chalkfest returns!
Jun 30, 2017 Celebrate Canada Day!
Jan 09, 2017 2016 Year-in-Review
Dec 20, 2016 Tourism update!
Nov 16, 2016 Fire Chief for a Day
Oct 11, 2016 Afternoon garage fire
Sep 20, 2013 Walk-ability Survey
Sep 20, 2013 Tidemark grant in aid
Sep 21, 2013 ECAP
Sep 21, 2013 George Paul Passing
Sep 21, 2013 MyCity info update
Sep 21, 2013 Seed saving
Oct 08, 2013 Fire Prevention Week
Feb 24, 2014 Roads Update
Sep 24, 2014 Fall Fire Safety
Dec 18, 2014 Fawn Rd. house fire
Feb 06, 2015 Fire crews kept busy
Feb 26, 2015 Mobile home fire
Jun 26, 2015 New art summer camps
Dec 04, 2015 Storm Warning!
Jan 04, 2016 Jan. 1 City Currents
Jan 07, 2016 New Robron Field open!
Upcoming Events