SConceptual DesignOUTH ISLAND HIGHWAY (19A) CONCEPTUAL DESIGN (PHASE 2), 2005

The South Island Highway (19A) Conceptual Design – Phase 2 report was completed by Lanarc Consultants in 2005. The report outlines a general plan for Highway 19A between Jubilee Parkway to 1st Avenue.In summary, the report considers a 3 lane cross-section, with bike lanes, sidewalk, an expanded Sea Walk, undergrounding Hydro lines, and additional parking locations. Phase 2 was completed in 2010 (between Hilchey and Rockland). Phase 3, between Rockland Road and the Big Rock Boat Ramp, was completed in 2021.