On this page, you can view current opportunities and set yourself up to be notified by e-mail of new opportunities.

CURRENT COMPETITIONS- Tenders, RFO's & RFP's

Bid Opportunity Details
Water Treatment Building General Contractors & Major Subcontractors
Reference #: PRE-QUAL 16-52
Commodity: Contractor
Site Meeting: Not Applicable
Technical Inquires: Clinton J. Crook, SCMP, CPSM - Senior Buyer
Original Publish Date: 7/21/2016
Closing Date and Time: 8/17/2016 3:00 PM
Status: AWARDED
Awarded to: Multiple Vendors (see above)

The City of Campbell River is establishing a Select List to pre-qualify General Contractors and Major Subcontractors for the construction of its new Water Treatment Building located at the John Hart Lake in Campbell River, BC. The general scope of work includes:

1. Rock and common excavation, concrete foundations and slabs, reinforcing steel, structural steel, exterior and interior finishes, building mechanical and electrical systems for a water treatment facility

2. Mechanical process preparing, pumping equipment, ultra violet disinfection equipment, sodium hypochlorite generators (OSHG) equipment and associated valves, metering and control devices.

3. Assume responsibility for Owner Supplied systems including vertical turbine pump package, OSHG package and relocation of existing in use ultra violet disinfection reactor system.

4. Electrical installation including site servicing, back-up generator package, instrumentation and controls.

5. Civil Works including approximately 200m of 1,200/1,000mm dia welded steel watermain with associated fittings and valves to be connected to existing water transmission system. Site works including septage tank, storm drainage, roadworks, parking, landscaping and environmental features.

6. Testing, commissioning and switch over of City water supply to new treatment building.
_____________________________________________
September 2nd, 2016
Based on the submission results of Pre-Qualification 16-52 Water Treatment Building General Contractors & Major Subcontractors, the following proponents have been successfully pre-qualified for this project:

General Contractors:
1. Aecon Water Infrastructure Inc.
2. Ketza Pacific Construction Ltd.
3. Kinetic Construction Ltd.
4. Knappett Projects Inc.
5. Maple Reinders
6. NAC Constructors Ltd.
7. Tritech Group Ltd.

Civil Sub-Contractors:
1. Acres Enterprises Ltd.
2. Aecon Water Infrastructure Inc.
3. Knappett Industries
4. Maple Reinders
5. NAC Constructors Ltd.
6. Tritech Group Ltd.
7. Upland Contracting Ltd.
8. Wacor Holdings Ltd.

Electrical Sub-Contractors:
1. Apple Electric Ltd.
2. Canem Systems Ltd.
3. Houle Electric Ltd.
4. NAC Constructors Ltd.
5. Raylec Power LP
6. Tritech Group Ltd.
7. Western Pacific Enterprises GP

Mechanical Sub-Contractors:
1. Aecon Water Infrastructure Inc.
2. Archie Johnstone Plumbing and Heating
3. Co-Gen Mechanical Services Ltd.
4. Maple Reinders
5. Mitchell Installations Ltd.
6. NAC Constructors Ltd.
7. Tritech Group Ltd.


You must either subscribe or log in to view the attachments


Can't open the files?
Free pdf download - just click the Acrobat icon!
To view this page properly please visit this page on a desktop device.