The City presently draws the majority of its water from a single source at John Hart Lake which is delivered to the community via a gravity based water supply and distribution system. The lake source water is provided by way of connection to each of the three (3) existing BC Hydro penstocks serving the John Hart Generating Station, at the City’s water treatment facility located above the generating station and adjacent to the three (3) BC Hydro surge towers. As part of the John Hart Redevelopment Project, BC Hydro will be replacing the John Hart Generating Station and deleting the penstocks. BC Hydro has now entered the construction phase of this project with an anticipated completion date being the end of 2018. The BC Hydro penstocks are currently scheduled to be removed in 2018 requiring the City to have a new, fully functional water supply in place by the end of 2017. 

To deliver the required water system infrastructure, The City and BC Hydro have worked together over the past 2 years to develop the City’s Water Supply Project Plan which has recently been finalized with the signing of the BC Hydro Municipal Water Supply Infrastructure Construction and Funding Agreement. This agreement sets forth the obligations of both parties in delivering a new water supply system for the City of Campbell River and defines the overall approach to be employed in delivering the new City water system infrastructure. 

The City Work Project Delivery Plan has been established within the agreement and includes a water transmission line down Highway 28 to connect to the existing watermain off Powerhouse Rd., and relocation of the City’s ultra violet and sodium hypochlorite treatment facilities to the new pump station building that will be constructed at John Hart Lake. 

The City Work is broken into two distinct phases. The first phase includes a 1.2km section of shallow bury, large diameter, welded steel pipe to be installed within the MoTI Hwy 28 ROW from Surge Tower Road to a point approximately 400m east of the Brewster Lake Road turn off, and 325m from Surge Tower Road to Powerhouse Road. The second phase includes approximately 1.4km of large diameter water pipe that will commence from Hwy 28 and connect to a new, independent lake intake structure with pump station and water treatment building.

Phase 1 Project Location Map

Phase 2 Project Location Map

Questions & Answers Phase 1

Questions & Answers Phase 2 Contract 2

For information on BC Hydro's John Hart Generating Station Replacement Project click here

Contact Information

Please contact the project team at capitalprojects@campbellriver.ca  if you have any questions or concerns.

What's New
Jul 25, 2017 Chalkfest returns!
Jun 30, 2017 Celebrate Canada Day!
Jan 09, 2017 2016 Year-in-Review
Dec 20, 2016 Tourism update!
Nov 16, 2016 Fire Chief for a Day
Oct 11, 2016 Afternoon garage fire
Sep 20, 2013 Walk-ability Survey
Sep 20, 2013 Tidemark grant in aid
Sep 21, 2013 ECAP
Sep 21, 2013 George Paul Passing
Sep 21, 2013 MyCity info update
Sep 21, 2013 Seed saving
Oct 08, 2013 Fire Prevention Week
Feb 24, 2014 Roads Update
Sep 24, 2014 Fall Fire Safety
Dec 18, 2014 Fawn Rd. house fire
Feb 06, 2015 Fire crews kept busy
Feb 26, 2015 Mobile home fire
Jun 26, 2015 New art summer camps
Dec 04, 2015 Storm Warning!
Jan 04, 2016 Jan. 1 City Currents
Jan 07, 2016 New Robron Field open!
Upcoming Events
Sep 01, 2017 Last Blast of Summer!